Sign In | Join Free | My uabig.com
China Wuhan Visbull Machinery Co., Ltd. logo
Wuhan Visbull Machinery Co., Ltd.
Visbull, Builds Your Life!
Site Member

10 Years

Home > Asphalt Mixing Plant >

Diesel Engine Asphalt Mixing Plant For Bitumen / Crushed Stones Project Building 380V 50HZ

Wuhan Visbull Machinery Co., Ltd.
Contact Now

Diesel Engine Asphalt Mixing Plant For Bitumen / Crushed Stones Project Building 380V 50HZ

  • 1
  • 2

Brand Name : Visbull

Model Number : SLJ-10

Certification : CE/SGS/ISO9001

Place of Origin : China

MOQ : 1Set

Price : Negotiation

Payment Terms : D/A, D/P, L/C, T/T, Western Union, MoneyGram

Supply Ability : 500set per month

Delivery Time : 25-30working days after received your payment

Packaging Details : Nude packing in container.

Productivity : 8-10 ton/h

Fuel : Light Diesel Fuel

Discharge Temperature : 120°-180°

Feed Port Capacity : 0.3M3/barrel

Generator Output : 380V / 50HZ

Bitumen Tank Capacity : 700kgs

Generator : 15KW

Dimension : 4600 X 2300 X 3400mm

Weight : 5.5Tons

Diesel Engine : 23KW

Contact Now

Diesel Engine Asphalt Mixing Plant For Bitumen / Crushed Stones Project Building 380V 50HZ

10TPH Bitumen Concrete Mixer SLJ - 10 With 23KW Diesel Engine And 380V / 50HZ Power Supply

10Tons Per Hour Asphalt Mixer SLJ-10

Specifications:

Productivity

8-10 T / H

Input Minerals capacity

0.30M3/Barrel

Suitable For

bitumen, crushed stones

Oil consumption

6 kg / t

Diesel Engine

23kw

Generator

15kw

Bitumen Tank Capacity

700Kg

Suitable fitting

Tube mainframe

4.0Kw

Asphalt Pump

2.0 Kw

Stone lifting equipment

3.0Kw

Diesel Pump

0.55Kw

Dusting blowing fan

3.0Kw

Blowing fan

4.0kW

Output Minerals temperature

120°C~180°C

Dimension (LxWxH)

4600 X 2300 X 3400mm

Weight

5.50 T

Operation and Function

The user should assign specific people who operate the machine and familiarize

operation manual basically, and put the machine into project building after adjusting

it to work regularly.

Testing and preparation work before use

a. Start cylinder motor, the tube is transferred, reverse cycle several times to check

whether their operation is normal or any un-normal aspects.

b. Lift the hopper, raise and down it again and again to make sure each component

of every engine flexible and reliable, up and down smoothly, the hopper door open

and close freely and position fixedly.

c.Start all the ventilation blowers to inspect if there is any air leak inside the middle

pipe.

d. Inspect all bolts fasten or not, especially the gasket ring, reducer bearings,

furnace body bearings, supporting roller bearings, and other parts.

Whole set trial before production

a. Filled the hopper with the mineral, asphalt tank should fill with hot asphalt

(asphalt temperature must above 160 ℃), the diesel oil tank filled with diesel oil.

b. Asphalt supply value adjustment:

Needed time= needed time X 60 (second)

c. Drying time set: due to temperature, moisture level of mineral aggregate, the

impact of factors such as temperature and drying time required in a certain range

adjustment may generally be adjusted in 200 to 260 seconds.

d. Mixing time settings: general mixing time set around 60 seconds, can be uniform

mixing.

Natural operational procedure

Generator output 380V, 50HZ three phase alternating current

Inspect each phase position of electric motor to evaluate if it is up to the mustard

Check the asphalt temperature reach 170 ℃ or not, so that asphalt pump can spray.

After inspection, start the dust abatement draft fan, burning draft fan, then start

cylinder and keep it running at the parch direction.

Start lifter, pour inert solid into tube, discharge the hopper.

Start the diesel pump, then press the ignition start, open oil pipe switch, after a few

seconds to see whether the firing was successful, if unsuccessful, start the blower

fan button, if not succeed, close the diesel pump and oil pipe switch, after 3 minutes

do it again.

g. When drying time arrived, stop diesel pump, the asphalt electric motor start by

itself at the same time. Put hot asphalt into the cylinder body, through asphalt time

relay cut off electrical asphalt motor automatically.

h. When the setting of the mixing time over, the main motor cylinder cut off

automatically.

Then press out materials button, making the motor reversal, finished unloading

materials until disposal to do so, a cycle ends here.

i. Second to re-mix the material, from the “d” item start for the next cycle.

Stands operation after the end of machine-team

a. After the unit to make cylinder idling 3-5 minutes.

b. Flicking the oil back switch, absorb the residual oil in the pipeline.

c. Clean up the residual asphalt inside the asphalt pump

d. Clean Asphalt pump use diesel cycle, open outer oil absorb port and hand spray

gun valve, other valves closed.

e. Close all motors and the diesel motor

f. Discharge all the asphalt remaining in the asphalt tank.

g. Release the dust in the Dust Collectors.

Diesel Engine Asphalt Mixing Plant For Bitumen / Crushed Stones Project Building 380V 50HZ


Product Tags:

asphalt batching plant

      

asphalt processing plant

      
Wholesale Diesel Engine Asphalt Mixing Plant For Bitumen / Crushed Stones Project Building 380V 50HZ from china suppliers

Diesel Engine Asphalt Mixing Plant For Bitumen / Crushed Stones Project Building 380V 50HZ Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Wuhan Visbull Machinery Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)